Skip to content
Absolute Environmental Solutions — home

Full Site Clearances & Bulk Waste Removal

We plan and manage complete site clearances and bulk waste removals, from single-unit strip-outs to multi-phase industrial decommissioning. Mixed waste streams are segregated for the best recovery rates and the lowest disposal cost, with all movements documented.

A permitted waste transfer yard with intermediate bulk containers, drums and bins arranged for onward disposal.

What a full site clearance covers

We plan and manage the complete clearance of industrial and commercial premises, from a single unit strip-out to a phased multi-building decommissioning. That includes the bulk waste, the redundant plant and fittings, the hazardous streams hiding among them, and the segregation work that decides how much the whole job costs.

The commercial point of a managed clearance is recovery. Mixed waste sent to landfill as one skip is the most expensive way to dispose of anything; the same material segregated into metals, timber, plastics, WEEE and residual waste usually costs a fraction as much, and some of it has a positive value.

Who it is for

Landlords and managing agents preparing a unit for reletting or for sale. Businesses relocating or consolidating sites. Insolvency practitioners and receivers who need a site cleared and evidenced to a deadline. Manufacturers taking a line out of service.

How a clearance runs

We survey the site and produce a written proposal: what is there, how it will be segregated, what is going where, what the recovery routes are worth, and what the residual cost will be. Where a deadline is fixed — a lease end, a completion date — the plan is built backwards from it.

Hazardous material is identified and dealt with first, because it is the part that stops a job if it is found halfway through. Everything else is segregated on site as it is removed, so the recovery rates are earned rather than hoped for. We appoint the licensed contractors, sequence the collections, and keep the site workable throughout where it is still in use.

Compliance and documentation

Every load leaves under the correct transfer or consignment note, moved by a registered carrier to a permitted or exempt facility. You receive the full pack at the end: the notes, the carrier registrations, the destination permits, weighbridge tickets, and a recovery and disposal summary showing what proportion of the site was recycled rather than landfilled.

That summary matters beyond compliance. If your organisation reports on waste diverted from landfill, a clearance is one of the largest single figures you will report in a year, and it needs to be evidenced.

What is usually found halfway through

Almost every clearance turns up something that was not on the original list. Asbestos-containing materials in a plant room. A partly buried tank under a hardstanding. Drums of an unlabelled liquid behind a stack of pallets. Fluorescent tubes, fire extinguishers, gas cylinders and old IT equipment, each of which has its own disposal route and none of which can go in a general skip.

The survey is written to find as much of that as possible before a price is given, because a discovery halfway through a clearance is what turns a fixed cost into an open one. Where something genuinely could not have been foreseen, we price it separately and tell you before it is moved rather than adding it to an invoice afterwards.

Working around an occupied site

Many clearances happen in buildings that are still in use, or on sites where another trade is working alongside. We sequence the work around your operation, agree access, storage and welfare arrangements in advance, and keep the routes your people use clear. Where a lease end or a completion date is fixed, the plan is built backwards from it and reviewed weekly against that date rather than against the volume of waste removed.

Site Clearances — common questions

Clearing everything left on a site — general and bulky waste, redundant plant, stock and often part-used chemicals — segregating it into streams, arranging compliant disposal or recovery for each, and handing back the building with a complete duty-of-care file. It is the service most often needed at the end of a lease, a closure or a refurbishment.

We survey the site first so that segregation is planned before a single container arrives. Clearing a building as one mixed load is the expensive answer twice over: it pays a hazardous rate on material that is not hazardous, and puts material that is into containers never described to hold it.

Yes, and it is one of the main reasons to use us rather than a general clearance firm. We identify and code the hazardous streams — drums, part-used product, laboratory chemicals, contaminated items — separately from the general waste, and arrange the right consigned route for each.

Where a material is unlabelled or has degraded we sample it rather than guess. Hazardous movements go out on consignment notes to permitted facilities; the rest goes on transfer notes. Everything comes back to you documented.

It is routed to recovery rather than disposal wherever the waste hierarchy and the economics allow — scrap metal, redundant plant, packaging and clean segregated materials often have a value, or at least avoid the landfill tax that disposal attracts.

That is a large part of where a clearance saves money: the more carefully a building is separated on the way out, the more of it goes to a recovery route rather than into a mixed skip priced at the disposal rate. The report you receive sets out where each stream went.

More questions are answered on our FAQs page.

All site clearances case studies

Get a price for site clearances

Tell us what is on site and we will arrange a free survey, then put a written proposal in front of you with the compliance route set out in full.